Local Projects · Installation & Replacement
An oil-furnace conversion with central filtration in Licton Springs
A new Mitsubishi Electric air handler now occupies the mechanical area at this Licton Springs home. Evergreen's completed project includes removal of the oil furnace and installation of a ducted Hyper-Heating system, with four-inch media filtration included in the work.
The installation
The indoor cabinet connects to sheet-metal ductwork above a black-and-white tiled floor. Insulated refrigerant tubing and condensate piping enter at the front. Outside, the heat pump sits on a pad beside the masonry wall.
Equipment installed
Outdoor heat pump: Mitsubishi Electric SUZ Hyper-Heating, model SUZ-AK30NLHZ. Ducted air handler: Mitsubishi Electric SVZ, model SVZ-AP30NL.
The completed scope includes an MHK2 controller, four-inch media filter, dedicated electrical work and oil-furnace removal.
What the project included
The filter and air handler share the central air path. The conversion brings together removal of the older source equipment and the new refrigerant, electrical and condensate connections needed for the heat-pump installation.
Planning a project at your home?
Tell us about your rooms, existing equipment and what you want to improve. We can help you compare the options.
